FASTRA, s.r.o. / FASTRA obtains extension of uthorization TICR

FASTRA obtains extension of uthorization TICR

As part of the expansion of the portfolio of work performed and based on the demand of our customers, we have supplemented our range of services in the field of work on pipeline systems with propane-butane.
As of October 7, 2020, we obtained authorization from the TECHNICAL INSPECTION OF THE CZECH REPUBLIC for installation and inspection of propane-butane gas pipelines and their mixtures on low, medium and high pressure gas pipelines.

tičr

24-10-2020, 12:34
Back to the site