To ensure that the high-pressure natural gas transfer system works as well as possible during line-stopping work, we decided to conduct tests on non-standard and critical situations in collaboration with HOMOLA a.s., which provided us with the necessary auxiliary equipment.
For example, we tested a simulation of a burst hose, and the unplanned closure of inlet and outlet fittings, a sudden drop or rise in pressure before and after the line-stopping head, and other scenarios. We strive to provide safe and quality services.