At the end of October, FASTRA, s.r.o. carried out double-sided stopling of the DN300 medium-pressure gas pipeline made of steel with a bypass. The course of work was under the control of the technical inspection of the Slovak Republic and our work was also inspected by the representatives of the operator and owner of the pipeline, SPP distribĂșcia as. All participants were very satisfied with the quality of our work and they also appreciated our new technology. They consider the FASTRA stopling technology to be a great benefit in improving safety when working on gas pipelines in operation and also in the versatility and ease of operation of the FASTRA technology. Our equipment can seal steel pipes up to DN500 and PE pipes up to PE315.