DN125 & DN100 Line Stopping
In June 2023, we performed a job of very interesting scope. We shut off several hot water pipes, 2× DN125 and 1× DN100, and everything had to be performed simultaneously because the piping was looped.
The works took place at a height of approximately 8 meters.
The installation site was very interesting as it was on the premises of the Temelín Nuclear Power Station.